Decommissioning

WARNING!
It is essential that the following points are observed in order to prevent damage to the equipment or critical
injury when the device is being decommissioned:
It is mandatory that all steps for decommissioning the machine are carried out in the indicated sequence:
First secure the working area for decommissioning, leaving plenty of space.
Read the chapter "Safety instructions".
Disassembly is carried out in reverse order to the assembly.
Please make sure that all operating material is disposed of in accordance with environmental regulations.
16.1

Temporary decommissioning

Measures are as above.
Also read the chapter "Transport and storage".
16.2

Final decommissioning/disposal

Measures are as above.
After disassembly, ensure that the disposal of the equipment and any materials it contains is carried out
in accordance with environmental regulations.