Decommissioning; Temporary Decommissioning; Final Decommissioning/Disposal - HADEF 23/09 Installation, Operating And Maintenance Instructions

Aluminium spur gear hoist
Table of Contents

Advertisement

Decommissioning

16
Decommissioning
Pos: 21.2 /---ALLGEMEIN/Hinweise/WARNUNG - Außerbetriebnahe: Schäden vermeiden.. @ 0\mod_1177597023398_52.doc @ 5591 @ @ 1
WARNING!
It is essential that the following points are observed in order to prevent damage to the equipment or critical
injury when the device is being decommissioned:
Pos: 21.3 /17-AUßERBETRIEBNAHME/Allgemein/Alle Außerbetriebnahme @ 0\mod_1173431980767_52.doc @ 671 @ @ 1
It is mandatory that all steps for decommissioning the machine are carried out in the indicated sequence:
 First secure the working area for decommissioning, leaving plenty of space.
 Read the chapter "Safety instructions".
 Disassembly is carried out in reverse order to the assembly.
 Please make sure that all operating material is disposed of in accordance with environmental regulations.
16.1

Temporary decommissioning

 Measures are as above.
 Also read the chapter "Transport and storage".
16.2

Final decommissioning/disposal

 Measures are as above.
 After disassembly, ensure that the disposal of the equipment and any materials it contains is carried out
in accordance with environmental regulations.