HADEF 19/90 Installation, Operating And Maintenance Instructions

HADEF 19/90 Installation, Operating And Maintenance Instructions

Monorail trolley, push travel trolley, hand geared trolley, electric trolley

Advertisement

Quick Links

Pos : 1.1 /1_H AD EF/---TITELSEITE/Symbol e/Länders ymbol @ 0\mod_1171286564146_52.doc x @ 55 @ @ 1
Pos : 1.2.1 /1_H AD EF/---TITELSEITE/Allgemein/Ti tel - BA @ 0\mod_1171286931725_52.doc x @ 57 @ @ 1
Installation,- Operating and
Maintenance Instructions
Pos : 1.2.2 /1_H AD EF/---TITELSEITE/Allgemein/H ADEF-Bezeic hnung @ 0\mod_1171289923124_0.doc x @ 69 @ @ 1
HADEF Monorail Trolley
Pos : 1.3 /1_H AD EF/---TITELSEITE/Ausführ ung en/19/90 - 22/90 - 22/90E @ 1\mod_1239177162140_52.doc x @ 9863 @ @ 1
push travel trolley
hand geared trolley
electric trolley
Pos : 1.4 /1_H AD EF/---TITELSEITE/Bauarten/leer-Standard @ 0\mod_1172062835772_52.doc x @ 201 @ @ 1
Pos : 1.5 /1_H AD EF/---TITELSEITE/Abbil dung/19/90+22/90 @ 1\mod_1238665615415_0.doc x @ 9720 @ @ 1
5.52.653.00.01.05
Type 19/90
Type 22/90
Type 22/90 E
Rev.05

Advertisement

Table of Contents
loading

Summary of Contents for HADEF 19/90

  • Page 1 Pos : 1.2.2 /1_H AD EF/---TITELSEITE/Allgemein/H ADEF-Bezeic hnung @ 0\mod_1171289923124_0.doc x @ 69 @ @ 1 HADEF Monorail Trolley Pos : 1.3 /1_H AD EF/---TITELSEITE/Ausführ ung en/19/90 - 22/90 - 22/90E @ 1\mod_1239177162140_52.doc x @ 9863 @ @ 1 push travel trolley...
  • Page 2: Table Of Contents

    Heinrich de Fries GmbH Heinrich de Fries GmbH, Gauss Str. 20, D-40235 Düsseldorf Heinrich De Fries GmbH will be named HADEF in the following text. Original operating- and maintenance instructions in German language. Translation in other languages is made of the German original.
  • Page 3: Information

    Maintenance ..................12 12.1 General ........................... 12 12.2 Monitoring ........................13 12.3 Brake motor ........................13 Inspection ..................14 13.1 Periodic checks ......................14 Service ..................... 14 14.1 Electric motor ........................ 14 Trouble ..................... 14 Remedy .................... 15 Decommissioning ................15 17.1 Temporary decommissioning ..................
  • Page 4: Duty Of Care Of The Owner

    Failure to follow the instructions of this manual can lead to unpredictable hazards. For any resulting damage or personal injury, HADEF assumes no liability. The unit was designed and built following a risk analysis and careful selection of the harmonized standards that are to be complied with, as well as other technical specifications.
  • Page 5: Appropriate Use

    Before starting work, the operating personnel must have read the operating and installation instructions, especially the chapter "Safety Instructions". This is especially important for operating personnel that rarely uses the equipment, i.e. for installation or maintenance work. DANGER! In order to avoid severe injury, please pay attention to the following when using the equipment: ...
  • Page 6: Transport And Storage

    DANGER! It is not permitted to use the unit in an area at risk from explosion! Pos : 8.3.1 /1_H AD EF/4--BESCHREIBUN G/F ahrwer ke/Aufbau/19/90+ 2290 @ 1\mod_1238679251696_52.doc x @ 9732 @ @ 1 Design Type 22/90 E electric trolley...
  • Page 7: Functions

    The best protection against functional failures in case of extreme environmental impact is the regular use of the equipment. Pos : 8.3.3.1 /1_H AD EF/4--BESCHREIBUN G/F ahr wer ke/Wichtige Bauteile/Fahr wer ke 19/90 - 22/90 - 22/09E @ 1\mod_1238998480370_52.doc x @ 9740 @ @ 1 Important components ...
  • Page 8: Installation

    9 suspension eye Pos : 10.3.2 /1_H ADEF /6--MONT AGE/F ahrwer ke 18/16VA+19/90 bis 28/ - 29/... - 209/05/19/90 bis 28/ - 209/05/2.Montage auf Tr äger - Fahr w.+ H-Z üge @ 0\mod_1182781260523_52.doc x @ 6580 @ @ 1 5.52.653.00.01.05...
  • Page 9: Installation On The Beam

    (3) and the safety nuts (4). Illustration 1 Pos : 10.3.3 /1_H ADEF /6--MONT AGE/F ahrwer ke 18/16VA+19/90 bis 28/ - 29/... - 209/05/19/90 bis 28/ - 209/05/3.Montage_Feststellring @ 1\mod_1267104431334_52.doc x @ 13089 @ @ 1 6.3.1...
  • Page 10: Tools

    Tools Capacity Size Tool 0,5t SW27 SW36 to 2t SW46 Load bar to 3,2t SW55 to 6,3t SW60 to 10t SW75 Load bar 12,5t SW22 with to 60t SW24 fixing ring diff. diff. diff. diff. Pos : 11.1 /1_H ADEF /7--BEDIENUNG/*Ü 1*/#. Kapitel - Bedi enung @ 0\mod_1172647408811_52.doc x @ 398 @ @ 1 Operation Pos : 11.2 /1_H ADEF /7--BEDIENUNG/Allgemein/01.Bedi enung - Alle @ 0\mod_1173087534915_52.doc x @ 440 @ @ 1 Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their...
  • Page 11: Operation

    Radio control 1 Lowering (slow - fast) 2 Lifting (slow - fast) 3 Trolley travel left side (slow - fast) 4 Trolley travel right side (slow - fast) 5 Crane travel south (slow - fast) 6 Crane travel north (slow - fast) 7 no function 8 no function 9 start...
  • Page 12: Power Supply

    NOTICE! Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting unit must be tested by a “qualified person” before putting into operation for the first time. Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley movement, must be tested by a “licensed qualified person”...
  • Page 13: Monitoring

     Only “qualified persons” may do this work.  Servicing and maintenance work must only be done when the hoist is not loaded.  Records must be kept of all test results and measures taken. Pos : 16.2.2 /1_H ADEF /12-IN STAND SET ZUNG/Allgemei n/02.Ü ber wachung @ 0\mod_1173254503420_52.doc x @ 472 @ @ 1 12.2 Monitoring The monitoring and servicing intervals stated are valid for operation under normal conditions and single-shift...
  • Page 14: Inspection

    Inspection Pos : 17.2 /1_H ADEF /13-PRÜFUN G/Wi eder kehrende Pr üfung/01.Wieder kehrende Prüfung @ 0\mod_1175675257580_52.doc x @ 3164 @ @ 1 13.1 Periodic checks Independently from the regulations of the individual countries, lifting devices must be checked at least yearly by a qualified person or licensed qualified person regarding its functional safety.
  • Page 15: Remedy

    Remedy Pos : 20.2 /1_H ADEF /16-ABHILFE/All e/01.Alle E+ P @ 3\mod_1414501384045_52.doc x @ 27821 @ @ 1 Problem* Unit Cause Remedy No main power Check connection to mains supply Unit cannot be switched on Electric Hoists Phase sequence not correct (with low voltage exchange 2 phases control) (see waring note at the plug)
  • Page 16: Final Decommissioning/Disposal

    17.2 Final decommissioning/disposal  Measures are as above.  After disassembly, ensure that the disposal of the equipment and any materials it contains is carried out in accordance with environmental regulations. Pos : 22.1 /1_H ADEF /18-BEISTELLUNG/*Ü1*/#. Kapitel - Beis tell ung von U nterlagen @ 0\mod_1173713105184_52.doc x @ 764 @ @ 1 Additional documents Pos : 22.2 /1_H ADEF /18-BEISTELLUNG/El ektro/El ektr o @ 2 \mod_1274853269057_52.doc x @ 14430 @ @ 1 18.1...

This manual is also suitable for:

22/9022/90 e

Table of Contents