Technical Data; Installation; Trolley; Tools - HADEF 11/09 Installation, Operating And Maintenance Instructions

Aluminium spur gear chain hoist
Table of Contents

Advertisement

In
case of ex p
roof hoists, t
Load chain
Ac
ccording to E
EN 818-7-T h
on
ly use origina
al chains.
Load hook
Fo
orged steel. R
Rotating, this
Overload pr
rotection
Ho
oists with ove
erload protec
slip
pping clutch
operates, lif
low
wered and re
educed to no
Hook suspe
ension
Th
e device is f
fitted with a s
ho
ok. Loosen t
the inner hex
5
Tec
hnical da
Ca
apacity
kg
Nu
umber of chain falls
Lo
oad chain
mm
Lif
fting path when reelin
ng off
30
0 m of hand chain
mm
Ha
and chain pull for liftin
ng
we
eight at 3 m lift
approx. kg
we
eight per add. m lift
kg
6
Inst
tallation
Th
e assembly
and installat
it c
can position i
itself freely.
6.1
1
Troll
ley
Fo
or assembly o
on a beam a
Th
is must be a
attached so
the
eir end positi
on when mo
Ge
enerally, add
itional lifting
tak
ke the weight
t of the devic
6.2
2
Tool
ls
7
Ope
eration
On
nly people th
at are familia
op
eration. The
y must be au
en
sure that the
e operating i
op
erating perso
onnel.
Lift
ting and Low
wering by pul
cha
ain.
Lift
ting - pull the
e chain fall at
the
e hand chain
n wheel turns
Lo
wering - pull
the chain fa
the
e hand chain
n wheel turns
8
the housing i
is only made
igh quality c
hain. All com
s facilitates a
ttaching the
ction protect
ts the hoist b
fting of the lo
oad is stopp
minal load.
special bolt f
for the hook
xagon, pull th
he bolt out, e
ata
250
500
1
1
5X15
5X15
940
940
N
110
210
8,9
8,9
1,5
1,5
tion depends
s on the local
travel limit m
must be place
that any ela
astic limitatio
oving.
gear (e.g. fo
ork lift, lifting
ces securely
.
ar with the o
operation of t
uthorized by
the employe
nstructions a
are available
ling the endl
ess hand
t the right sid
de –
s clockwise
all at the lift s
ide –
s anti-clockw
ise
e of steel plat
tes.
mponents ma
atch precisely
load and avo
oids twisting
by a slipping
g clutch from
ped. Lifting is
s only possib
suspension
. It makes it
exchange the
e hook, inser
1000
1500
1
1
6,3X19,1
8X24
870
640
350
390
12,2
17,6
1,8
2,3
l environmen
nt. The hoist
ed at either e
end of the tra
on buffer or t
the trolley w
g platforms) w
will be requir
the lifting de
vices and cr
er for the op
peration of th
e near the eq
quipment an
Illustr
ration3
y to each oth
her. Therefo
of the chain
. With safety
m damage by
y overload. W
ble again afte
ter the load h
easier to ch
hange the su
t the bolt aga
ain and tighte
2000
3000
2
2
6,3X19,1
6
8
8X24
435
320
350
390
15,6
24,5
2,7
3,7
must be sus
spended in a
ack.
wheels are dr
riven agains
red for the as
ssembly. Th
ranes may be
e entrusted
e equipment
t. The emplo
d that they a
are accessib
5.52.189
re please
y catch.
When the
has been
spension
en it.
5000
5
3
8X24
8
200
2
420
4
35
5,2
a way that
t them in
ese must
with their
oyer must
ble for the
.00.01.05

Advertisement

Table of Contents
loading

Table of Contents