Replacing The Load Chain; Inspection; Periodic Checks - HADEF 11/09 Installation, Operating And Maintenance Instructions

Aluminium spur gear chain hoist
Table of Contents

Advertisement

11.3

Replacing the load chain

CAUTION!
If there is any visible damage and when the conditions for replacement are reached (i.e. one or several
dimensions in the table have been reached, there is corrosion or elongation), the chain must be replaced.
When replacing the chain, also check the chain wheels.
Procedure:
Only insert new chains in an unloaded state and as the chains that are currently in the device – i.e. not
twisted.
Remove chain from its fastening at the end and attach a chain link which is open at the side.
A chain link which is open at the side, can
easily be produced by grinding out a small
piece. The opening must have the same
thickness as the chain link.
Hang a new original chain (same size and oiled) in the side opened chain link and insert it.
Make sure the chain is not installed twisted.
Make sure the chain links are aligned in one direction.
Assemble the chain to the end fastening.
12

Inspection

12.1

Periodic checks

Independently from the regulations of the individual countries, lifting devices must be checked at least yearly
by a qualified person or licensed qualified person regarding its functional safety.
12.1.1
Components to be checked
The following must be checked:
Dimensions of load chain, load hooks, pawls, bolts, ratchet wheels, brake linings.
The dimensions must be compared to the dimensions in the tables.
A visual inspection for deformations, cracks and corrosion must be carried out.
Check screw connections
Check lifting, lowering functions.
Check brake function
for ratchet lever hoists: Check free-wheeling mechanism of the
chain
Brake - check wear of brake lining
Check chain wheels, ratchet wheels and pawls.
Clean and lubricate the load chain.
Check the load chain for elongation and wear
Check the load hook for cracks and deformation
Load hook - check the safety catch
Check and lubricate the bearing of the chain pulleys.
Check the chain pulleys
Have the equipment checked by a qualified person
(periodic inspection)
WARNING!
If one or several of the dimensions fall below or exceed the dimensions in the table, or if cracks or
corrosion are found, the parts must be replaced with original spare parts.
5.52.189.00.01.05
Illustration 4
at
daily
commissioning
checks
X
X
X
X
X
X
X
X
X
X
1st maintenance
Inspection
after
Maintenance
3 months
every
3 months
X
X
X
X
X
Inspection Mainte-
nance
every
12 months
X
X
X
X
X
X
X
11

Advertisement

Table of Contents
loading

Table of Contents