Schulte SDX-102 Operator's Manual page 41

Snow removal
Table of Contents

Advertisement

NOTE: In order to be able to disconnect the power shaft while the snow blower is connected to the three point
hitch, the distance between shaft ends must be above the minimum dimensions below, when the snow
blower is on the ground.
Minimum to Remove/Install Power Shaft
Minimum to Install
540 RPM
11. Attach the tractor shaft assembly to the snow blower and tractor. Depress the lock pin and slide the yoke
into place. Release the lock pin.
Pull and push on the quick disconnect yokes several times to ensure that the yokes are
properly connected to their respective shafts.
12. Check that the snow blower is level side to side. Adjust tractor lift link if necessary.
13. Check that the tractor three point hitch check chains are snug but not overly tight. Side sway should be
kept to a minimum.
Carefully raise and lower the snow blower and check for any possible interference
between the snow blower and tractor. Turn discharge chute full length and right. Make
adjustments if necessary.
Before operating the snow blower carefully read the Safety and Operation Sections of this
operator's manual.
SDX-102 05/19
© 2019 Alamo Group Inc.
ASSEMBLY
Table 2:
540 RPM
34-1/2" (875mm)
Assembly Section 3-5
1000 RPM
31-1/2" (800mm)
1000 RPM

Advertisement

Table of Contents
loading

Table of Contents