Infinity 600HD Instruction For User, Installation & Servicing page 29

Table of Contents

Advertisement

600 HD INSTALLATION INSTRUCTIONS
Offer the fire box assembly within the masonry aperture at the same time guiding the gather
hood within the guides situated on the top of the fire box (Please see Fig 2). Engage the hood
studs within the slotted holes and secure using the three M4 nuts provided within the gather
hood kit.
Checking the flue fire opening and fire opening.
Check that the chimney conforms to the required specification as previously stated. Examine
the condition and carry out any remedial work including removing any debris from the base.
If the flue has been used for solid fuel it should be swept prior to installation.
Prior to installing the appliance a smoke test (using a bomb) should be carried out to check that
satisfactory smoke clearance has been established. If all the smoke is not drawn into the flue,
pre-heat the flue with a blowtorch or similar and retest. If there is any uncertainty examine for
the cause and if necessary seek expert advice.
When installing the appliance against a dry lined plasterboard wall ensure that the void
between the plaster board and wall is sealed with a non-combustible material.
No combustible material should be fitted inside the fireplace opening.
LT7618 Issue No 1 (06/2018)
P a g e
| 28

Advertisement

Table of Contents
loading

Table of Contents