Infinity 600HD Instruction For User, Installation & Servicing page 27

Table of Contents

Advertisement

600 HD INSTALLATION INSTRUCTIONS
Open the aperture size to accommodate the fire box as out lined at the beginning of the
section. With the height of the opening established and support for the fire box in place, take
out a further area of the plaster board lining to expose the inner brick work face of the chimney
breast as out lined in Fig 1.
The exposed area should be 455mm from the base of the fire and 840mm in the width. With the
slip bracket attached to the fireplace frame. Secure the fire box back against the inner brick
work face of the chimney breast using rawl plugs and wood screws.
New plaster board can now be fitted to cover the exposed metal work, making sure that no
plater joints are positioned directly above the unit as highlighted in the Fig 2 above.
C-Wet plaster hole in the wall.
When the chimney breast front has been finished using wet plastered method and the total
thickness of the bonding plus finishing plaster is less than 12mm. The following method will need
to be applied.
Fit the fire box using the guidance stipulated earlier in the section when fitting the fire box with
none combustible slips. With the fire box secured fit 12.5mm thick plaster board section to cover
the complete front area of the chimney breast up to the forward projected edge of the firebox
frame. Please note avoid any plaster board joints directly above the unit.
12.5mm
Platerboard
LT7618 Issue No 1 (06/2018)
P a g e
| 26

Advertisement

Table of Contents
loading

Table of Contents