Pronar T023, Pronar T023M

4.1 PREPARING THE TRAILER FOR WORK

4.1.1 PRELIMINARY INFORMATION

The trailer is supplied to the user completely assembled and does not require additional
mounting operations of machine sub-assemblies. The manufacturer guarantees that the
machine is fully operational and has been checked according to quality control procedures
and is ready for use. This does not release the user from an obligation to check the
machine's condition prior to purchasing and before first use.

4.1.2 HAND-OVER AND INSPECTION OF THE MACHINE AFTER

DELIVERY

After delivery of the machine to the buyer, the user is obliged to check technical condition of
the trailer (one-time inspection). While buying the machine, the user must be informed by the
seller about the method of use of the machine, risks resulting from the use for purposes other
than intended, the method of the machine hitching and the principles of the machine
construction and design. Detailed information concerning the machine hand-over are
included in the WARRANTY BOOK.
Checking the trailer after delivery
• Check completeness of the machine according to order.
• Check technical condition of safety guards.
• Check condition of paint coating; check the machine for traces of corrosion.
• Check the machine for damage resulting from wrong transport of the machine to
its destination (crushing, piercing, bending or breaking of minor elements etc.).
• Check air pressure in tyres and check correct tightening of wheel nuts.
• Check technical condition of drawbar eye and if correctly installed.
If non-conformities are found, do not hitch and start using the trailer. Discovered defects
should be notified directly to the seller in order to remove them.