FP optimail Operator's Manual page 53

Hide thumbs Also See for optimail:
Table of Contents

Advertisement

Step 3: Installing optimail
Step 4: Inserting the ribbon cassette
Appendix - Instructions for installation and commissioning
Scope of delivery:
1
optimail franking machine
2
Power cable
3
Modem cable
4
Ribbon cassette
5
Keys, 2
6
Operator manual and quick reference
7
PIN Card (not shown)
• Choose an installation site with the following
ambient conditions:
– Room temperature 10°C to 40°C
(The best printing quality is achieved at a room
temperature of 15°C to 35°C.)
– No direct sunlight
– Power socket in the immediate vicinity.
• Place the optimail on a firm, level, horizontal base.
• Open the flap of the ribbon cassette compartment
by lightly pressing the release key.
The flap swings up automatically to the stop.
53

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the optimail and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents