4.4 Installation of roof cover (TPR-H, TPR-V, TPR-CH, TPR-CV)
In the event that roof covers are supplied apart to be mounted later than the unit and/or its external sections
CCS/CDX, it is always possible to install them on the existing unit/sections.
For external sections CCS/CDX, both horizontal and vertical version, it is supplied a roof cover which, before
coupling unit and section according to the instructions of next 4.5, shall be interchanged with the unit roof element
placed on the coupling side (fig. 9a).
For mounting roof cover elements, preventively unscrew the M6 screws by a 5 mm Allen key (A in fig. 9b); further,
on vertical unit, the upper bracket (B) shall be removed.
As first, place the intermediate roof cover plate, fix it by screwing the same M6 screws, preventively provided with
the special rubber washers supplied together with the roof covers.
The jointing side of each end side roof plates shall be first hooked to the intermediate plate vertical protrusions
by an about 45° rotation, then placed upon the upper panels and finally fixed by M6 screws with rubber washer.
Complete the installation by sealing the connection lines between element and element.
A
A
MIUM0018_REV06_ QRCE_20180312-MIUM-ENG-AQ
QRCE
QRCE
B
A
Fig. 9b
ENG
CCS/CDX
CCS/CDX
Fig. 9a
A
AQ_001523_02_0721
14

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QRCE Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Qrce 500Qrce 1000Qrce 1500Qrce 2000Qrce 3000Qrce 4000

Table of Contents