CHAPTER 5: INSPECT THE ROUGH OPENING
The width of the Rough Opening should equal: PACKAGE WIDTH
1. Ensure the Rough Opening is correct size.
The height of the Rough Opening should equal: PACKAGE HEIGHT
X
X
Note: Make allowances for tile or other existing materials that may change the floor height.
2. Ensure the floor is level across the entire opening. If used, check recessed threshold across the door opening.
90.0°
R.O.
HEIGHT
1/4"
DN 1740
(6mm)
CHAPTER 6: ASSEMBLE DOOR FRAME (NO TRANSOM)
DN 0768
1. Position Jamb Tubes on either side of Header according to the instruction sticker located on each Jamb Tube, showing
proper location and orientation.
a. Ensure the removable cover side of Header is facing up.
Fixed Sidelite: Removable Cover side of Header must face the Exterior side of building.
2. Orientate the Frame in relation to the building:
Full Open: Removable Cover side of Header must face the Interior side of building.
X
X
FIXED SIDELITE UNITS:
ACCESS COVER TYPICALLY
FACES THE EXTERIOR
DN 0394
R.O. WIDTH
90.0°
FINISHED FLOOR
1/4"
(6mm)
SINGLE
NOTE: Header diagrams shown with Access Cover removed.
Door
Opening
GT1175StandardSlideDoorsInstallationManual;withU30Control
1/4 INCH ON EACH SIDE
+
1/4 INCH
+
1/4"
(6mm)
Floor
BI PART
Door
Opening
Figure 5 Orientate the Door Frame in relation to the Building
1-3/4"
Recess Threshold
Recessed
Threshold
Figure 4 Masonry Opening
FULL OPEN UNITS:
ACCESS COVER TYPICALLY
FACES THE INTERIOR
P/NC-00105
4-1/2"
1/2"
7 of 56