STAGES OF A STANDARD INSTALL INCLUDE...
Approximately
90 minutes
PREPARE
To prepare for the install, you will need to
assess the scenario: check the door's readiness,
test the drag force of the door, plan how the
system will mount, and gather any necessary
tools and materials.
INSTALL
During the install, you will mount the AutoSlide
drive system to the door frame or floor, then attach
the rack to the sliding door panel.
OPERATE
To operate your door, you will need to connect the
power and program the Controller. Once
connected, you can then synchronize the Wall
Push Buttons and/or other sensors to the Controller
and test how the door operates.
FINALIZE
Once installed and set up, place the cover back on
the drive unit and conceal cables as desired. The
unit can also be concealed and covered with a
faux valence or access panel.
Need help?
Do you have a question about the iLock and is the answer not in the manual?
Questions and answers