VETRON 5374 Service Manual page 43

Hotair welding machine
Table of Contents

Advertisement

MIN
MAX
0.01
5
0
5
3
75
0
60
0
10
20
100
0
5
0,5
10
-10
+10
10
40
100
600
0
100
0
75
0
10
0
2,5
0,2
24
50
300
10
40
0
12
0
12
0
4
DEFAULT
UNIT
0.02
mm
1,1
sec
Aus
41,7
mm
9,6
mm
1,8
m/min
84
%
0,8
sec
1,8
m/min
0
%
35
l/min
400
°C
71
%
43,2
mm
1,0
sec
0
sec
16,0
mm
200
°C
20
l/min
1,0
sec
4,0
sec
0
mm
DESCRIPTION
Program name, free choice
Value between the wheels, upper wheel has to press the lower
wheel
Time till the tape would be threaded/shot.
Settings of the blower tube:
1. O ; 2. On; 3. preheating; 4. welding
Tape length after cutting, between knife and nossle.
Tape length after P012 until the start of welding between the
upper and lower wheels (wheel centers)
Infeed speed of the tape length 1a
Reduced speed as a percentage of the welding speed
Time, from P014 to P017
Welding speed
Di erential gear of the upper wheel
Airflow for the welding process
Welding temperature
Increased speed at the end after the tape cut
Tape length of P012+P013, for a clean seam end
Time for temperature reduction, after cutting for the nozzle
Time after finisching the welding process
until raising the upper wheel
Ventilation height of the upper wheel at standstill
Preheat temperature (optionally switchable on the control panel)
Air flow for preheating the upper wheel (P027)
Time at the seam interruptions (without cutting)
untill the nozzle retracts
Time at welding breaks, until the tempreature reduction began
Raising the upper wheel in Pedal position 0 at welding breaks
02/2021
Vetron 5374 HotAir-Welding
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

5474

Table of Contents