LN2600 Rugged Security Router
Related
Documentation
62
shipping materials, or contact your Juniper Networks representative for information on
approved packaging material.
To pack the LN2600 hardware for shipment:
Issue the proper shutdown commands to halt your system.
1.
Switch all power switches to the OFF position.
2.
Remove the router from the rack-mounting or the wall-mounting unit.
3.
Place the router in its protective container, and then put the router in a box, placing
4.
packing foam around the router.
Parts Inventory (Packing List) for the LN2600 Router on page 32
Information You Might Need to Supply to JTAC on page 61
Inspecting the Hardware on page 31
Copyright © 2018, Juniper Networks, Inc.