Agilent Technologies 5975 Series Operating Manual page 65

Msd for openlab cds
Hide thumbs Also See for 5975 Series:
Table of Contents

Advertisement

3
Intuvo 9000 GC Column Maintenance
5 Unscrew the tip seal from the tip seal holder and remove the tip seal and
6 Ensure the MS is properly aligned with the GC. If the GC/MS is not properly
7 Open the GC front door.
8 Open the bus door and remove it by lifting the door vertically off its hinge
9 Using the Intuvo torque driver, remove the compression bolt that secures the
Thumb screw
MS tail heater assembly clamp
Compression bolts
Figure 15.
10 Open the MS tail heater assembly by loosening the thumb screw at the top of
11 Push the MS tail heater assembly back a few millimeters. A magnet will hold
5975/5977 Series MSD Operating Manual
spring from the GC/MS interface. (See
aligned, the transfer line clamp screw will be difficult to tighten.
pins.
9000 GC/MS Tail click and run bus connection. Also remove the bolt from the
empty bus connection.
MS tail heater assembly clamp closed
the clamp and rotating the clamp down.
the heater assembly away from the 9000 GC/MS Tail.
"Interface tip seal"
on page 70.)
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5977 series5977b

Table of Contents