Venting Of Hp-Pump, Fuel Pump And Detergent Pumps - Nilfisk-Advance SH AUTO Series Instructions For Use Manual

Table of Contents

Advertisement

SH AUTO
Assembly box, mains cable
(see pos. 18 on the illustration
at the end of this manual)
3.6 Venting of HP-pump,
fuel pump and detergent
pumps
8
The electric cable can be lead
in through:
1. The bottom plate
2. The punch-out pieces in the
rear plate and through the
relief ring into the junction
box.
(see illustration at the end of
this manual).
PE
L1
L2
L3
N
1
 Connect the phase cords of
the supply cable to the con-
nection terminals L1, L2 and
L3. Connect the neutral cord
to N.
• Connect protective earth
wire to the earthing terminal.
When the SH AUTO is properly connected to supply water, electri-
cal installation and the wash boom / high-pressure hose are fi tted,
the SH AUTO's hydraulic and fuel lines must be vented before it is
operational.
● Set thermostat (5) to 40 ºC. SH AUTO D: Adjustment on the side
of the electric box. Temperature appears from display. Change of
digital readout - press potentiometer.
● Fill fuel into the fuel container (9).
● Fill No Scale into the container (22).
● Fill detergent containers (8) with the appropriate detergents (see
section 4.1.8).
SH AUTO D
• Check and measure the
protective earth connection
according to legislation.
• Connect the other end of
the cable to an approved
pluggeed socket outlet of a
correct dimensioned main
supply.
All terminals are placed in junc-
tion box X2.
Make sure that the cable is
properly guided and relieved
between the fi xed installation
and the machine and that the
cable is without any damage to
the insulation.
Also see notes in section
"1 Safety precautions and
warnings"!
Note: Beware that the
electric cables of the
machine are not mixed
up. The wires 1, 2, 3, 4 MUST
keep the illustrated positions.
SH AUTO E
20°
60°
Original Instructions
40°

Advertisement

Table of Contents
loading

Table of Contents