baltur TBML 50 ME Installation, Use And Maintenance Instruction Manual page 57

Two-stage electronic modulating gas/diesel burner
Hide thumbs Also See for TBML 50 ME:
Table of Contents

Advertisement

Available languages

Available languages

BURNER CONNECTION TO THE BOILER
ASSEMBLING THE HEAD UNIT
• Position insulating seal -13 on the sleeve, placing rope -2
between the flange and the seal.
• Adjust the connection flange -19 position loosening the screws
-6. The burner head must penetrate to the extent requested by
the generator manufacturer.
• Fasten the burner -18 to the boiler -1 with the stud bolts, wa-
shers and nuts provided -7.
DANGER / CAUTION
Completely seal the gap between the burner sleeve and
the hole in the refractory material inside the boiler door with
suitable material.
ASSEMBLING THE GAS TRAIN
The EN 676 approved gas train is sold separately from the burner.
The gas train can be assembled in different ways: -8 and (8a).
1
7
11 / 44
0006160028_201510
13
2
25
18
6
8a
8
ENGLISH

Advertisement

Table of Contents
loading

This manual is also suitable for:

56460010

Table of Contents