UPS5000-S-1200 kVA
User Manual
Context
Before a capacity test, ensure that:
● The UPS is working in normal mode; float charging or hibernation has lasted
● The UPS has generated no battery overtemperature, overvoltage, or overcurrent
● The mains, batteries, charger, and discharger are normal. No overload alarm is
● The SmartLi has generated no alarms related to lithium batteries.
Procedure
Step 1 On the home screen of the power unit LCD, choose Power Unit N Info. >
Maintenance > Battery Maint.
Step 2 Tap Start next to Capacity Test to start a capacity test.
Figure 5-14 Starting a capacity test
----End

5.6.3 Test Data Download

Issue 08 (2020-12-15)
NO TICE
for 2 hours after the state of charge (SOC) reaches 100%; and the load ratio
fluctuation is less than 10%.
alarm. No generator is connected to the UPS.
generated.
NO TE
The capacity test automatically stops in any of the following cases:
● The minimum cell voltage reaches 2.6 V.
● The load fluctuation exceeds 10%.
● An alarm is generated.
The test is complete when the minimum cell voltage reaches 2.6 V. Data about the most
amount of energy discharged is stored once a month for 36 months.