Connecting And Powering On The Cutter; Turning The Cutter On (The Initialisation Process) - Intec ColorCut FB550 Series Installation & Setup Manual

Dual tool, flatbed digital die-cutters
Table of Contents

Advertisement

3.3.1 Connecting and powering on the cutter.

Turning the cutter on (The Initialisation Process)

1.
Connect the control cable for the Vacuum Pump to the Vacuum Pump control jack
on the underside of the contr ol panel
C
mains socket
on the control panel and connect to an electrical outlet of the specified
voltage.
2.
Turn on the power.
3.
The green power lamp
illuminate. A Safety message will appear on the LCD panel asking your to pr ess
the [ENTER] key to continue.
H
4.
Next the Intec ColorCut Flatbed digital cutter will move the T ool
closest point as shown in the figu e above and then the beam
ZERO point (furthest left point as indicated with the green
These operations ar e part of the initialisation pr ocess; once the T ool Carriage
has moved to the fr ont point and the beam to the furthest left point (The cutter
has determined the ZERO Origin point) and the display will change to display
the HOME screen and the cutter is ready for use. (Ensure the Cutter is ON-LINE
before proceeding).
Intec Printing Solutions - Manual for ColorCut flat bed series FB550 ..................................................................................... Page No: 25
B
. Securely plug the power cor d into the
D
on the contr ol panel will light, the LCD display
C
B
F
G
D
E
Carriage F
G
H
mark above) .
E
will
to the
will move to the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Colorcut fb750 seriesColorcut fb1150 series

Table of Contents