Equipment Check For Leaks In The Complete System, Pump, Distributor, Electrode Leads And Suction Cups; Testing Requirements - GE KISS Service Manual

Electrode application system
Table of Contents

Advertisement

Testing instructions for KISS™ and KISS™ Multilead
The electrodes must adhere securely.
4.
Changing the pressure with the regulator results
on the suction cups.
Negative pressure regulator in position
Equipment Check for Leaks in the Complete
System, Pump, Distributor, Electrode Leads and
Suction Cups

Testing Requirements

• Pneumatic Transducer Tester PTT, e.g., X-Caliber (shown in mmHg)
• Ohmmeter/Multimeter
• Test plate for connection of a suction electrode
see
"1. Test Plate (p/n 30344490)" on page 45
• Y-adapter (for connection negative pressure tubing <-> PTT)
see
"2. Y-Adapter (p/n 30344489)" on page 45
• Dummy plug for distributor
see
"4. Dummy Plug for KISS™ (p/n 30344488)" on page 46
20
KISS™ / KISS™ Multilead
in a visible effect
(left), the electrodes should drop off.
22745010H

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kiss multileadKiss-10Kiss-12

Table of Contents