Testing Electrical Function (Kiss™ Multilead); Kiss™ - Disassembly, Assembly; Distributor - GE KISS Service Manual

Electrode application system
Table of Contents

Advertisement

Testing Electrical Function (KISS™ Multilead)
Resistance between the leadwire connector and the KISS™ electrode connector. The
measured resistance must be 10 kohm ±1kohm.
CAUTION:
It is prudent to make this measurement without electrodes as the silver-silver
chloride electrodes must not come into contact with other metals.
Leadwire connector (KISS™ Multilead)
KISS™ - Disassembly, Assembly
Disassembling and Assembling the Controller and the End
Piece on the Distributor
Remove all electrode leads on the distributor. There are 4 spring catches to be opened
for each lead.
First of all lift up 2 spring catches on one side with a pair of pointed tweezers (Caution:
Do not overstretch!) and lift component slightly, then lift up the next 2 spring catches
on the other side and remove component (controller or end piece).
22745010H
Testing instructions for KISS™ and KISS™ Multilead
KISS™ / KISS™ Multilead
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kiss multileadKiss-10Kiss-12

Table of Contents