COVERING INSTALLATION

A
C
C
C
1) VERSION WITH CERAMIC SIDES AND
TOP
Fig. 1
The stove is delivered (Fig. 1) with the following external com-
ponents already installed:
• metal sides (A-B)
• metal frames for fastening the ceramic side elements (C)
• Upper/lower metal front (D-E).
The pieces indicated below are packaged separately.
• 2 upper ceramic side elements (F - Fig. 3)
• 2 lower ceramic side elements (F1 - Fig. 3)
• 1 lower ceramic side element (G - Fig. 4)
• 1 upper ceramic side element (H - Fig. 7)
• 1 ceramic top (I - Fig. 9)
• 18 milled pins M4
• 18 washers
• 4 springs (G1)
• 4 M4 screws
• 6 rubber pads (M)
To t proceed as follows:
Fig. 2
Remove the two metal frames (C) from the stove by raising
them and sliding them outwards.
Fig. 3
Fit the metal fastening frames (C) on the back of the vertical
ceramic elements (F-F1) using the holes and the M4 milled pins
provided (8 for each side).