EN 14785:2006 PELLET STOVE, trade name EDILKAMIN, model CHERIE UP SERIAL NO.: Rating plate reference CHERIE UP H: Performance declaration: (DoP - EK No. 092): Moreover, the company hereby declares that: the CHERIE UP wood pellet stove satisfies the requirements...
First ignition is required for activation of the Edilkamin manual, observe local regulations. manufacturer warranty. The warranty is only valid in the The diagrams provided in this manual are for illustration country where the product was bought.
DO NOT PLACE LAUNDRY ON Edilkamin nor the retailer are liable for damage resulting from incorrect THE APPLIANCE. DO NOT PLACE DRYING RACKS WITHIN THE SAFETY installation or maintenance. CLEARANCE. Keep flammable fluids Safety risks may be caused by: away from the appliance.
TECHNICAL CHARACTERISTICS TECHNICAL CHARACTERISTICS in accordance with EN 14785 Nominal power Reduced power 16,2 Available power 11,8 Power for water Efficiency 91,6 97,6 CO emissions at 13% O 0,010 0,025 Fumes temperature °C Fuel consumption kg/h Tank capacity Draw Autonomy hours Heatable volume * Water content...
UNPACKING PREPARATION AND UNPACKING Carry out all movements in a vertical The packaging materials are neither toxic nor noxious position, using appropriate means. and do not require special disposal. The user is Be careful to follow all relevant safety responsible for storing, disposing of and recycling regulations.
STEEL CLADDING As indicated in the “Packaging” section, the steel cladding parts are contained in three separate boxes • the box with the steel side panels • the box with the bottom front panel, brackets and small parts • the box with the cast iron top box with the steel side panels keep this for the assembly of the cladding box with the cast iron top...
Page 9
STEEL CLADDING Description Reference in Quantity Figures Side panel (bottom right or top left) Side panel (bottom left or top right) Brackets for fitting the side panels brackets for the side panels (2 per side panel) and small parts washers, nuts, M5 screws 4 M5 toothed washers for side panels 20 M6 screws and M6 toothed washers for front panel Bottom front panel...
Page 10
STEEL CLADDING To assemble the two sides, we recommend that you place them on the shaped polystyrene piece and proceed as follows 1. bring the side panels together, place the central spacer and screw them together (1); shaped polystyrene piece central spacer washer screw...
Page 11
STEEL CLADDING 2. Place the brackets. Tighten the screws and also insert the nuts and washers above and underneath, only on one side. NOTE For a better understanding of the position, the image below shows the components in a vertical position, but we nevertheless recommend that you work in a horizontal position on top of the shaped polystyrene piece.
Page 12
STEEL CLADDING 3. position the metal support. Tighten the screws and also insert the nuts and washers above and underneath, only on one side. toothed washer washer Make sure that the central spacer has been placed “cut” on the metal support in the “cut”...
Page 13
STEEL CLADDING Then hook the assembled side panel with the metal support to the structure (inside the slots) and re-tighten the screws securing the metal supports screws for fitting the metal supports 3. Fitting of the bottom front panel Open the combustion chamber door using the removable handle. Hook the bottom front panel (4 hooks, two per side) and fasten it with the M6 Allen screw and the toothed washer.
Page 14
STEEL CLADDING 4. Fitting the top Place the top by slotting it onto the two pins. Put the pellet tank cover back on, by tightening the wing screws removed at point 1. INSTALLER...
CERAMIC CLADDING As indicated in the “Packaging” section, the ceramic cladding parts are contained in three separate boxes • box with the ceramic side panels • box with the bottom front panel, brackets and small parts • box with the ceramic top box with the ceramic top box with the ceramic side panels shaped...
Page 16
CERAMIC CLADDING Description Reference in Quantity Notes the figures Washer D5 For side panels and front panel Screw TE M4x10 For side panels and front panel Adjustment bracket For side panels Screw 4.2x9.5 For side panels at the top and bottom for small bracket (h) Rubber item screw M6 For top panel...
Page 17
CERAMIC CLADDING 1. Remove the pellet tank cover Loosen the wing screws underneath and remove the pellet tank cover by pulling it towards the front. This will subsequently enable you to position the top and screw on the side panels wing screws 2.
Page 18
CERAMIC CLADDING To assemble the two sides, we recommend that you place them on the shaped polystyrene piece and proceed as follows Bring the ceramic side panels together (1) shaped polystyrene piece Position the two adjustment brackets on the ceramic piece and apply the screws without tightening them adjustment bracket (c) adjustment bracket (c) screw TE M4x10 (b)
Page 19
CERAMIC CLADDING Position the small bracket with the cage nut on the metal support and screw on with the supplied M4.2x9.5 screw. The drawing shows the left side panel (for the location of the small adjustment bracket). metal support Once the metal support has been assembled with the small bracket, place it on the ceramic pieces and apply the screws and washers but without tightening, as shown in the figure below.
Page 20
CERAMIC CLADDING Before tightening the screws, for each of the two ceramic pieces (above and below): position the template for fitting the side panels; template Do not force the screw into the threaded bushing - it may break. Respect the distances between the metal support and the ceramic piece as in the drawing (60 and 70 mm). The 70 mm measurement can also be taken from the template position reference measurement reference measurement...
Page 21
CERAMIC CLADDING Then hook the assembled side panel with the metal support to the structure (inside the slots) and re-tighten the screws securing the metal supports screws for fitting the metal supports POSSIBLE ADJUSTMENTS The brackets allow internal/external adjustment The slots allow forward/backward adjustment in the top part The small brackets allow forward/backward adjustment in the bottom part The adjustment screw on the small bracket is used to secure the side panel and to further adjust its position.
Page 22
CERAMIC CLADDING 3. Assembling and fitting the bottom front panel Assemble the front panel by positioning the brackets (one per side) and fasten them with the screws In order to align the cladding more efficiently, it may be necessary to insert washers * as indicated below. washer screw M4 Open the combustion chamber door using the removable handle.
Page 23
CERAMIC CLADDING 4. Fitting the top Position the four screws with rubber plugs onto the holes in the structure. They are used for any necessary adjustment operations. Place the top by slotting it onto the two pins. Put the pellet tank cover back on, by tightening the wing screws removed at point 1. plug in rubber screw plug in rubber...
GLASS CLADDING As indicated in the “Packaging” section, the glass cladding parts are contained in three separate boxes • the box with the glass side panels • the box with the glass bottom front panel, brackets and small parts • the box with the cast iron top.
Page 25
GLASS CLADDING 1. Remove the pellet tank cover Loosen the wing screws underneath and remove the pellet tank cover by pulling it towards the front. This will subsequently enable you to position the top and screw on the side panels. Make sure that you disconnect the display cable so as not to break it.
Page 26
GLASS CLADDING To assemble each of the two side panels: position the top and bottom brackets, placing the washers in between position the metal support and screw it on with the three top screws For a better covering position it may be necessary to place) washers: 3 screws for fixing the support onto the bracket silicone washer...
Page 27
GLASS CLADDING Then hook the assembled side panel with the metal support to the structure (inside the slots) and re-tighten the screws securing the metal supports. screws for fitting the metal supports 3. Fitting of the bottom front panel Open the combustion chamber door using the removable handle. Hook the bottom front panel (4 hooks, two per side) and fasten it with the M6 Allen screw.
Page 28
GLASS CLADDING 4. Fitting the top Place the top by slotting it onto the two pins. Put the pellet tank cover back on, by tightening the wing screws removed at point 1. INSTALLER...
STONE CLADDING As indicated in the “Packaging” section, the stone cladding parts are contained in three separate boxes • the box with the side panels • the box with the bottom front panel • the box with the cast iron top. box with the cast iron top box with the bottom front pane the box with the side panels...
Page 30
STONE CLADDING 1. Remove the pellet tank cover Loosen the wing screws underneath and remove the pellet tank cover by pulling it towards the front. This will subsequently enable you to position the top and screw on the side panels. Make sure that you disconnect the display cable so as not to break it.
Page 31
STONE CLADDING 3. Fitting of the bottom front panel Open the combustion chamber door using the removable handle. Hook the bottom front panel (4 hooks, two per side) and fasten it with the M6 Allen screw. fasten it with the M6 Allen screw 4.
Contact the authorised Edilkamin Technical Assistance itself, or in any area with an explosive atmosphere. Centre. Any extraction fans operating in the same room or area as the product, may affect its draw.
Page 33
INSTALLATION FLUE SYSTEM • be certified, with a chimney plate if metal (Smoke duct, flue and chimney pot) • be of uniform cross section or vary in cross section This chapter has been drawn up pursuant to European only immediately after the outlet, not at some mid regulations EN 13384, EN 1443, EN 1856 and EN point of its length.
Page 34
INSTALLATION THE FLUE: EXTERNAL AIR INTAKE Further to the general prescriptions for the smoke duct In general, we suggest two ways to ensure a proper and flue, the flue: flow of combustion air. • must serve solely to discharge smoke •...
Page 35
The electrical system must be compliant; check the operation of the earth in particular. Edilkamin is not responsible for malfunctions resulting from an improperly earthed system. The power line must be of adequate section for the power of the appliance.
Page 36
OTHER HYDRAULIC COMPONENTS BE INSTALLED WITHIN THE BOILER STOVE BY PURCHASING A KIT FROM EDILKAMIN OR IF PREPARED BY THE INSTALLER. Plumbing depends on the type of system. However, there are some “general rules”: • The hydraulic system must operate at a pressure between 1 and 1.5-2 bar at running temperature...
Page 37
INSTALLATION LEGEND Electronic control box Boiler stove Pump (circulator) ACS: Domestic Hot Water EV2: 2-way solenoid valve Ball valve RA: Radiators Cold Water EV3: 3-way solenoid valve Automatic air vent valve Return System Mains water supply NA: Normally open VEC: Closed expansion tank Drain Boiler NC: Normally closed...
PUMP: INSTALLATION AND OPERATING INSTRUCTIONS CONTROL MODES AND FUNCTIONS Variable differential pressure Δp-v (I, II, III) Recommended for two-pipe heating systems with radiators to reduce the flow noise at thermostatic valves. The pump reduces the delivery head to half in the case of decreasing volume flow in the pipe network.
Page 40
PUMP: INSTALLATION AND OPERATING INSTRUCTIONS VENTING Activate the pump venting function via the operating button: press and hold for 3 seconds, then release. •The pump venting function is initiated and lasts 10 minutes. •The top and bottom LED rows flash in turn at 1 second intervals.
Page 41
PUMP: INSTALLATION AND OPERATING INSTRUCTIONS Press the BUTTON LED display Control mode Pump curve Constant speed Constant speed Variable differential pressure Δp-v Variable differential pressure Δp-v Variable differential pressure Δp-v Constant differential pressure Δp-c Constant differential pressure Δp-c Constant differential pressure Δp-c Constant speed Pressing the button for the 9th time returns to the factory setting (constant speed / pump...
Page 42
PUMP: INSTALLATION AND OPERATING INSTRUCTIONS Lock/unlock the button To activate the key lock, press and hold the operating button for 8 seconds until the LEDs for the selected setting briefly flash, then release. •LEDs flash constantly at 1-second intervals. •The key lock is activated: pump settings can no longer be changed.
Page 43
PUMP: INSTALLATION AND OPERATING INSTRUCTIONS FAULT SIGNALS • The fault signal LED indicates a fault. • The pump switches off (depending on the fault) and attempts a cyclical restart. FAULTS CAUSES REMEDY Blocking Rotor blocked Activate manual restart or Lights up red contact customer service Contacting/ winding Winding defective...
INSTRUCTIONS FOR USE FIRST IGNITION (COMMISSIONING) PHASES LOADING THE PELLETS INTO THE TANK. • Make sure you have read and understood this To access the tank, press on the cover which has a manual click opening (use the glove if the stove is hot). •...
Page 45
DISPLAY INTERFACE: display on the top or remote control display o, immagine pannello sinottico touch bianco. ancesco, immagine pannello sinottico touch bianco. gine pannello sinottico touch bianco. panel botton 0/1: to turn on and off (hold down for 2”) and to exit from the menu during programming Pressing briefly displays the set temperature and the working temperature;...
Page 46
INSTRUCTIONS FOR USE Filling the feed screw Manual ignition (in case of start up failure) If the pellet storage tank is completely emptied, it follows At a temperature lower than 3 °C – too low for the electri- that the Archimedes’ screw is also emptied. cal resistance to become red hot - or if the resistance is Before restarting the stove you must fill it by following these temporarily not working, you can use a firelighter to ignite...
INSTRUCTIONS FOR USE Shutdown Once you have chosen the day by scrolling through While the boiler-stove is working pressing the 0/1 them with the + and – keys, confirm by pressing MENU key for 2 seconds begins the shutdown process and and proceed with the settings of the programs in the “STOPPING”...
Page 48
INSTRUCTIONS FOR USE Should this correction not suffice, contact Temperature the Edilkamin-authorised Dealer, to establish Temperature provided by No adjustment the new operating axis. provided by Configuration external (factory set- the remote environmental ting) Notes on flame variability: ny changes in the...
Page 49
INSTRUCTIONS FOR USE REMOTE CONTROL This controls all the functions. It is necessary to point it directly at the boiler-stove. For further information contact our customer service centre. Key to buttons and display: : ignition / shutdown button +/- : to increase/decrease the various regulations : button to switch to the “EASY TIMER ”...
Page 50
INSTRUCTIONS FOR USE USING THE “EASY TIMER” PROGRAM The new remote control allows you to manage a timer pro- gram that is very intuitive and easy to use: - If the boiler-stove is on: a delayed shutdown can be set from the remote control - from one to twelve hours. The remaining time for the scheduled shutdown is shown on the display of the synoptic panel.
MAINTENANCE Before doing any maintenance, disconnect the appliance from the mains. Regular maintenance is essential to keeping the appliance in good working order. Failure to service the product properly will prevent it from working properly. Any problems due to failure to service the stove will void the warranty.. DAILY MAINTENANCE Do not dump the cleaning residue into the pellet tank.
Page 52
MAINTENANCE DAILY MAINTENANCE When the product is switched off and cold, it is advisable to operate the cleaning system using the supplied tool. 1. Open the combustion chamber door (P). The grate consists of two parts (A1 and A2). It is snapped into position in its housing.
Page 53
You should clean the chimney system at least once a Using non-original spare parts may damage the year (check local regulations for details). appliance and relieves Edilkamin of all liability for damage resulting there from. If you fail to regularly clean and inspect the system,...
TROUBLESHOOTING If any problems occur, the boiler stove will automatically stop by performing the switch- off operation and a message will be displayed indicating the reason why it has been switched off (see below for the various reasons). Never remove the plug while the appliance is shutting down. If the boiler stove goes into block, you must allow the shut down procedure to finish com- pletely (10 minutes with a beep), and then press the 0/1 button in order to restart it.
Page 55
TROUBLESHOOTING MESSAGE PROBLEM SOLUTION displays if the water reading • Contact the technician H2O PTC FAULT probe is faulty or disconnected displays when the thermocouple detects a fume temperature Stop Fire • Check that there are pellets in the tank lower than the set value and •...
Page 56
TROUBLESHOOTING If pellet loading fails, especially after a power failure, check whether the safety thermostat has intervened (A). If the temperature is too high, it switches OFF the product by cutting off the power supply to the gear motor. If the thermostat is activated, it must be reset pressing softly with a thin object.
Page 60
*941386-GB* w w w . e d i l k a m i n . c o m cod. 941386-GB 10.18/H...
Need help?
Do you have a question about the CHERIE UP H and is the answer not in the manual?
Questions and answers