22. Close the Vivado test application
X-Ref Target - Figure 1-39
23. When the exit confirmation window appears, click OK
X-Ref Target - Figure 1-40
24. Navigate to the C:/vivado_work/project_1/project_1.runs/impl_1
KC724 IBERT Getting Started Guide
UG931 (v1.0) October 23, 2012
Figure 1-39: Close Button
Figure 1-40: Close Confirmation
directory to locate the resultant bitstream.
www.xilinx.com
Creating the GTX IBERT Core
(Figure
1-39).
UG931_c1_40_100812
UG931_c1_39_101512
(Figure
1-40).
41
Need help?
Do you have a question about the KC724 IBERT and is the answer not in the manual?
Questions and answers