Stone Protection; Quick-Push Shearpin - HE-VA Combi-Disc 4,5 m Operating Instructions Manual

Table of Contents

Advertisement

Combi-Disc 4,5 – 5,5m Part 1
UK
20-01-2021

Stone protection

Quick-Push shearpin

When the shear bolt is broken and the tine has been released, place the shear bolt one notch forward
before the machine can operate again.
Pull out the hair-clip (Pos. 1).
Pull the tine back to normal working position (Pos. 2).
Push the shearpin (Pos. 3) one notch forward to a new position in the
tine. Do not push the bolt totally through
(it can be necessary to remove soil etc. from the hole in the tine).
Important: All activities under the machine are deprecated when the
shearpin is being moved or changed.
Push back the hair-clip (Pos. 1), so that it locks the shear bolt in its place,
and the machine is ready for operation.
When the shearpin is broken for the eighth time, it is used up.
Be aware that the shearpin must never be shorter than 65 mm.
When a new shear bolt is mounted it is important that it is placed rightly.
The end of 40 mm (Pos. 3) is to turn away from the tine.
OBS: A → Shims must always be mounted on the opposite side as the shearpin is inserted from.
14
Back to the table of contents

Advertisement

Table of Contents
loading

This manual is also suitable for:

Combi-disc 5,5 m

Table of Contents