ESPEC Platinous Series User Manual page 49

Table of Contents

Advertisement

Installation
Use water pipe for the supply and drainage lines.
1. Rig piping between the supply source and the chamber. Use piping that fits the water supply and drain
ports (1/2" FPT)
2. Wrap the male end threads of the nipple and pipes with sealant tape.
W
RAPPING THREADS WITH SEALANT TAPE
FIGURE 5.23.
Sealant tape
3. Attach the water pipes to the supply and drain ports on the chamber.
Platinous User's Manual
43

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Platinous Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF