Ruijie RG-NBS3100 Series Switches Hardware Installation and Reference Guide
LED
Panel Identification
LED
RJ45
port
PoE
1-8
status LED
SFP port status LED
9F-10F
2 Preparation before Installation
2.1 Safety Suggestions
To avoid personal injury and equipment damage, please carefully read the safety suggestions before you install the
RG-NBS3100 series.
The following safety suggestions may not cover all possible dangers.
2.1.1 Installation
Keep the chassis clean and free from dust.
Do not place the equipment in a passage.
Do not wear loose clothes or any other things that may be caught by the chassis during installation and
maintenance.
Turn off all power supplies and remove the power sockets and cables before installing or uninstalling the device.
2.1.2 Movement
Do not frequently move the device.
While moving the device, keep its balance and avoid your legs, feet and back from being hurt.
Before moving the device, turn off all power supplies and dismantle all power modules.
2.1.3 Electricity
Observe local regulations and specifications when performing electric operations. Relevant operators must be
qualified.
Before installing the device, carefully check any potential danger in the surroundings, such as ungrounded power
supply, and damp/wet ground or floor.
Before installing the device, find out the location of the emergency power supply switch in the room. First cut off
the power supply in the case of an accident.
Try to avoid maintaining the switch that is powered-on alone.
State
Meaning
The port is receiving or transmitting traffic at
Blinking green
10/100/1000 Mbps.
Off
PoE is not enabled.
Solid green
PoE is enabled. The port is operational.
Blinking green
The port has a PoE fault of overload.
Off
The port is not connected.
Solid green
The port is connected at 100/1000 Mbps.
The port is receiving or transmitting traffic at
Blinking green
100/1000 Mbps.
Preparation before Installation
17
Need help?
Do you have a question about the RG-NBS3100 Series and is the answer not in the manual?