2-4-3. Operation Test

1. Preparation of Test
Prepare VISCA communication software as shown in above 2-4-1. Item 1. When adjustment is completed
normally, pan and tilt keep staying at HOME position.
2. High Speed Operation Test (Pan)
(1) Transmission at 8101062213FF (Receiving of debug command enabled)
Commands of 9041FF and 9051FF are returned to Response Window.
(2) Transmission at 8101060218140F0A060000000000FF (Moving of pan and tilt)
When command of 9041FF is returned to Response Window, move the pan at left side position and
tilt at HOME position. Therefore, wait until pan and tilt are stopped and 9051FF is returned.
(3) Transmission at 8101061100050a00FF (Pan high speed test)
When command of 9041FF is returned to Response Window, move the pan at right side.
After finish the moving, measurement result and error code is returned. (Refer to Table. 4).
Confirm the following item is normal condition.
. The time required: Less than 0078h
. Maximum speed: More than 0338h
. Error code:
00h: Finished normally
01h: Stop in the midst of operation
02h: Large torque load applying in stop position
n
When unusual occurs in the time required, maximum speed or error code, it may cause failure of the
motor or motor drive circuit (insufficiency of torque), or pan rotating mechanism unusually (large
friction) etc,.
EVI-D100/EVI-D100P
2-33