Toyota 30 Series Manual page 99

Battery forklift
Table of Contents

Advertisement

Disassembly Procedure
(1) LH Rear Lift Cylinder.
Remove the safety down valve.
1
Remove the cylinder cover. [Point
2
Remove the seals from the cylinder cover.
3
Remove the piston rod. [Point
4
5
Remove the wear ring.
6
Remove the bleed screw.
Remove the cylinder. [Point
7
(2) RH Lift Cylinder.
Loosen the cylinder cover. [Point
1
Remove the piston rod. [Point
2
Remove the piston. [Point
3
Remove the piston seals.
4
Remove the cover and the seals.
5
6
Remove the bleed screw.
Remove the cylinder. [Point 4 1
7
Reassembly Procedure
The reassembly procedure is the reverse of the disassembly procedure.
Note:
Apply MP grease or hydraulic oil on the packing, O-ring, and dust seal lip portion.
Apply sealant
(08833-00080)
Upon completing the installation of the FV rear lift cylinder, perform air bleeding in the following
sequence:
Extend the
(1)
Stop the engine.
(2)
Loosen the bleed screw by the time oil will come out and tighten the bleed screw again.
(3)
on the threaded portion of the cylinder cover before tightening.
rear lift cylinder.
Point Operations
[Point
1 ]
Disassem bly.Reassernbly:
SST 09620-1 01 00-71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents