Door Preparation; Mark Centerlines - Assa Abloy Corbin Russwin ED8400 Series Installation Instructions Manual

Non-reversible vertical rod exit devices
Table of Contents

Advertisement

ED8400 Series
Vertical Rod Exit Devices
Installation Instructions
2

Door Preparation

a

Mark Centerlines

Mark centerlines on INSIDE of door. Establish the horizontal centerline of the device by drawing a line
across the door 40-5/16" above floor line. Establish the top and bottom rod backset centerline by drawing
a vertical line from the top to bottom of the door measuring from the low side of the door bevel.
(Figure 3)
Inside of LHRB Door is Illustrated
*Regularly furnished unless otherwise ordered.
"A" Dimension
1-7/8"
1-5/16"
For installation assistance contact Corbin Russwin
1-800-543-3658 • techsupport.corbinrusswin@assaabloy.com
Copyright © 2011, 2019, ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole
or in part without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
Low Side of Door Bevel
Subtract 1" from this measurement
and cut top rod to this measure length.
7/8"
2-9/32"
2-1/16" Recommended
(Style Permitting)
Rod Guide, Position
midway between active
and top latch cases.
C L
11/16"
2-7/8"
Refer to Template
1-7/16"
Rod Guide, Position
midway between active
and bottom latch cases.
Variable
(Subject to Adjustment)
"A" Dimension
Installation
Surface Strike
Flush Strike
Top of Door
Stop Line
See Mounting
Instructions
C L
Device
40-5/16"
Bottom
of Door
Floor Line
Figure 3
4
FM22 06/19

Advertisement

Table of Contents
loading

Table of Contents