GE Feeder Management Relay 750 Instruction Manual page 290

Table of Contents

Advertisement

8.3 METERING
1.
Repeat Steps 2 to 5 above.
2.
Record the measured current demand at 1, 2, 3, 4, 5 and 6 minutes after the application of current. The demand, in
percent of injected current, should be as follows:
TIME (MIN.)
Demand (% of Input)
For Rolling Demand (for example, a time interval setting of 5 minutes), the procedure is as follows:
1.
Repeat Steps 2 to 5 above from Thermal Exponential Demand above.
2.
Record the measured current demand at 1, 2, 3, 4, 5 and 6 minutes after the application of current. The demand, in
percent of injected current, should be as follows:
TIME (MIN.)
Demand (% of Input)
b) REAL POWER DEMAND
For these tests, refer to the figures on page 8–3 for test connections. The expected accuracy is as follows:
Expected Accuracy: ±2.0% of full scale
The relevant actual values displays are shown below:
A2 METERING
A2 METERING
A2 METERING
A2 METERING
Follow the procedure in Current Demand on page 8–13, except that the injected and monitored parameter is watts.
c) REACTIVE POWER DEMAND
For these tests, refer to the figures on page 8–3 for test connections. The expected accuracy is as follows:
Expected Accuracy: ±2.0% of full scale
The relevant actual values displays are shown below:
A2 METERING
A2 METERING
A2 METERING
A2 METERING
Follow the procedure in Current Demand on page 8–13, except that the injected and monitored parameter is vars.
d) APPARENT POWER DEMAND
For these tests, refer to the figures on page 8–3 for test connections. The expected accuracy is as follows:
8
Expected Accuracy: ±2.0% of full scale
The relevant actual values displays are shown below:
A2 METERING
A2 METERING
A2 METERING
A2 METERING
Follow the procedure in Current Demand on page 8–13, except that the injected and monitored parameter is VA.
8-14
Courtesy of NationalSwitchgear.com
1
2
0.0
0.0
1
2
20.0
40.0
DMND
REAL PWR
LAST REAL PWR DMND
DMND
REAL PWR
MAX REAL PWR DMND
DMND
REAL PWR
MAX REAL PWR DATE
DMND
REAL PWR
MAX REAL PWR TIME
DMND
REACTIVE PWR
LAST REACTIVE PWR DMND
DMND
REACTIVE PWR
DMND
REACTIVE PWR
DMND
REACTIVE PWR
DMND
APPARENT PWR
LAST APPARENT PWR DMND
DMND
APPARENT PWR
DMND
APPARENT PWR
DMND
APPARENT PWR
750/760 Feeder Management Relay
3
4
5
0.0
0.0
100.0
3
4
5
60.0
80.0
100.0
MAX REACTIVE PWR DMND
MAX REACTIVE PWR DATE
MAX REACTIVE PWR TIME
MAX APPARENT PWR DMND
MAX APPARENT PWR DATE
MAX APPARENT PWR TIME
8 COMMISSIONING TESTS
6
100.0
6
100.0