Installing A Condensate Neutralizer - IBC EX Series Installation & Operating Manual

Commercial condensing boilers
Table of Contents

Advertisement

Warning
After installing a condensate neutralization package, the pH of the condensate discharge
must be measured on a regular schedule to ensure the neutralizing agent is active and
effective.

3.7 Installing a condensate neutralizer

Warning
Fill the trap with water before
initially firing the boiler to prevent
exhaust fumes from entering the
room. Never operate the boiler
unless the trap is filled with water.
Failure to comply will result in
severe personal injury or death.
3.7 Installing a
condensate neutralizer
If discharging condensate into building drain
piping materials that are subject to
corrosion, use a neutralization package.
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ex 400Ex 500Ex 700Ex 850

Table of Contents