Installation Clearances; Exhaust Venting And Air Intake Venting - IBC EX Series Installation & Operating Manual

Commercial condensing boilers
Table of Contents

Advertisement

3.4 Installation clearances

Warning
Exposed water piping and associated components (relief valves, circulators, etc.,
should not be in contact with combustible materials. Check local codes for required
clearances and / or provide adequate insulation.
Surface
Front
Rear flue connection
Left side
Right side
Top
Bottom
Table 3
Clearance distances for boiler mounting sites

3.5 Exhaust venting and air intake venting

Warning
Venting, condensate drainage, and combustion air systems for all IBC boilers must be
installed in compliance with all applicable codes and with instructions provided in the
respective installation manuals.
Inspect finished vent and air piping thoroughly to ensure all are airtight, and comply with
the instructions provided as well as with the requirements of applicable codes. Failure to
comply will result in severe personal injury or death.
When planning a boiler's installation, consider the appropriate vent materials, travel and
termination.
EX 400, EX 500, EX 700, EX 850
Minimum distance from
combustible surfaces
2"
2"
1"
1"
6"
0
18
Section: Installation
Recommended clearance for
installation and service
30"
24"
2"
4"
12"
(required for filter replacement)
0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ex 400Ex 500Ex 700Ex 850

Table of Contents