SN
6
7
8
9
10
11
12
13
14
15
16
Step 2 See

Table 5-9 Checklist for the connection of the signal cables

SN
1
2
3
4
5
6
7
8
Issue 02 (2009-04-20)
Check Item
Labels are attached to both ends of the power cables and grounding cables.
The power cables and grounding cables are not damaged or broken.
There are no connectors or joints on the power cables or grounding cables.
There are no breaking equipment, such as switches and fuses, in the
electrical connection of the grounding system.
The redundant part of the power cables or grounding cables is stripped
off rather than coiled.
The lugs on both ends of the power cables or grounding cables are
soldered or crimped securely.
Bare wires and lug handles at the wiring terminals are tightly wrapped
with insulating tapes or heat-shrinkable tubes.
The flat washers and spring washers are well mounted on all wiring
terminals.
The diameter of the positive pole of the primary power supply connected
to the earth complies with the standard requirements.
The working grounding and protection grounding of the BTS and the
surge protection grounding of the building share one group of grounding
conductors.
The grounding grids of the tower, equipment room, and distribution
transformer (if the distance between the transformer and the equipment
room is less than 30 m) constitute an integrated grounding grid.
Table 5-9
to check the connection of all the signal cables.
Check Item
The connectors of the E1 cables are tight and secure.
The connectors of the E1 cables are intact.
The E1 cables or RF cables are not damaged or broken.
The connectors of the RF cables are fixed in position to prevent the
possible false connection from causing abnormal voltage standing wave
ratio (VSWR).
The horizontal RF cables are clamped to the cable trough.
The proper cable surpluses are reserved at the connectors.
All cables are neatly bound with ties installed at even intervals, to a proper
tightness, and in the same direction.
Extra cable ties are cut off. All cuts are smooth without sharp projections.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Commissioning the BTS (Transmission Unavailable)
5-33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3900a gsmV300r008

Table of Contents