BTS3900(A) GSM
Commissioning Guide
The Set Communication Port Parameter dialog box is displayed, as shown in
Figure 5-3 Set Communication Port Parameter dialog box
Step 3 In the Select Communication Port area, click Network Port. In the Configure IP area, set the
IP address to 192.168.0.72.
Step 4 Click OK.
The Site Maintenance Terminal System window is displayed, as shown in
Step 5 In the Site Maintenance Terminal System window, click User, and select User Login. Enter
User Name (Omc by default) and User Password (omc by default). Logging in to the BTS
succeeds.
----End
5.2 Configuring the Basic Data of the BTS
This describes how to configure the basic data of the BTS such as the BTS boards and logical
objects of the site. If the commissioning is performed on the BTS side, other commissioning
tasks can be performed only after the configuration of the basic data of the BTS.
5.2.1 Obtaining the Site Management Rights
This describes how to obtain the site management rights. Before configuring the BTS board and
site logical objects, you must obtain the site management rights after logging into the BTS at
the local end.
5.2.2 Configuring the Boards of the BTS on the SMT
This describes how to configure the TRX boards and other boards of the BTS.
5.2.3 Configuring Logical Objects of the BTS on the SMT
This describes how to configure logical objects of the BTS. The BTS logical object configuration
consists of the cell configuration, carrier binding, and activation of cell configuration data.
Issue 02 (2009-04-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Commissioning the BTS (Transmission Unavailable)
Figure
5-3.
Figure
5-1.
5-5