Long-Term Shutdown - Thermo Scientific ISQ EC Operating Manual

Hide thumbs Also See for ISQ EC:
Table of Contents

Advertisement

6
Operation
6.7.2

Long-Term Shutdown

Powering Off the Instrument
Page 158
Figure 85: Smart Standby Parameters
Use the information in this section to prepare the system for high-level
maintenance and repair
TIP Shutting down the mass spectrometer affects the operation of the
system. When shutting down the MS, also observe the shutdown
instructions for the other system modules and take appropriate action (refer
to the Operating Manuals for the modules).
To power off, follow the instructions below.
1)
Flush the system with an appropriate, pure solvent (minimum LC/MS-
grade) that does not contain any salts. Make sure that residual sample
components, impurities from the column, or buffers are completely
removed from the detector.
2)
Cool down the vaporizer.
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isq em

Table of Contents