10.3 Replacement Parts
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
10
The parts in the table below may be ordered and installed by the user. See
Chapter 7, Maintenance and Service
parts listed in Table 23.
Part Number
1R120590-4502
1R120590-6220
80000-60317
80000-60321
1R120590-0032
1R120590-0024
80000-60165
1R76022-14633
1R4035-0600
1R76256-0090
1R120590-6221
1R120590-3002
1R76433-0060
1R120590-6204
Accessories, Consumables and Replacement Parts
for information about installing the
Description
Ion Transfer Tube (spare included in installation kit)
PEEK Tubing and Fittings Kit
Grounding union (spare included in installation kit)
Fitting, Fingertight, 1 piece
Fitting, Fingertight, 2 piece
PEEK Tubing, Green, 1/16 in. OD × 0.03 in. ID (5 ft.)
PEEK Tubing, Red, 1/16 in. OD × 0.003 in. ID (5 ft.)
Replacement Rubber Slit, Top Left Corner of Instrument
Spray Needle, HESI II (spare included in installation kit)
Spray Probe, HESI II
HESI Spray Chamber (full assembly)
HESI/APCI Spray Chamber Assembly (ISQ EM only)
Spray Probe, APCI (ISQ EM only)
Replacement Electron Multiplier (multiplier only)
Bulkhead, LC/IC Input, PEEK
Grounding Union (spare included in installation kit)
Calibrant Valve Rotor Rebuild Kit
Replacement Calibrant Solution Lid and Tubing
Calibrant Valve Sampler Loop, 500 µL
Calibrant Solution, 250 mL
Page 217
Need help?
Do you have a question about the ISQ EC and is the answer not in the manual?