General Preparations - Schmalz SCPS-L Series Operating Instructions Manual

Compact ejector
Table of Contents

Advertisement

8.2   General Preparations
Always carry out the following tasks before activating the system:
1. Before each start of operations, check that the safety features are in perfect condition.
2. Check the ejector for visible damage and deal with any problems immediately (or notify your super-
visor).
3. Ensure that only authorized personnel are present in the working area of the machine or system and
that no other personnel are put in danger by switching on the machine.
There must be no people in the system danger area while it is in operation.
EN-US · 30.30.01.02636 · 00 · 01/21
Operation
29 / 40

Advertisement

Table of Contents
loading

Table of Contents