Pin Assignment; Process Data; Start Of Operations - Schmalz SCPS-L Series Operating Instructions Manual

Compact ejector
Table of Contents

Advertisement

Installation
7.4.1   PIN Assignment
PIN assignment, 5-pin M12 connector
M12 connector
1)
When using Schmalz connection cable part no. 21.04.05.00080
7.5   Process Data
During operation of the ejector, all input and output signals are connected to a controller, either directly
or using intelligent terminal boxes.
For this purpose, not only the supply voltage but also two input signals and one output signal should be
connected to allow the ejector to communicate with the controller.
The basic ejector functions such as suction, blow off and feedback are used with these signals.
In detail, they are:
Process data INPUT
Signal
0
Process data OUTPUT
Signal
0
1
7.6   Start of Operations
A typical handling cycle is divided into the following three phases: pickup, blowoff and idle.
To check whether sufficient vacuum has built up, the limit value H2 is monitored by an integrated vacuum
sensor during suction and output to the higher-level controller via OUT.
Phase
Switching
step
1
1
2
2
3
4
3
5
26 / 40
1)
PIN
Wire color
1
Brown
2
White
3
Blue
4
Black
5
Gray
Symbol
OUT 1
Symbol
IN 1
IN 2
NC version
Signal
IN1
OUT
IN1
IN2
OUT
Symbol
Function
U
Supply voltage for sensors/actuators
S/A
IN1
"Suction" signal input
GND
Ground for sensors/actuators
S/A
OUT
"Part Present" check signal output (H2/
h2)
IN2
"Blow off" signal input
Parameter
Vacuum limit value H2 ("Part
Present" check)
Parameter
Suction ON/OFF
Blow off ON/OFF
Status
Suction ON
Vacuum > H2
Suction OFF
Blow off ON
Vacuum <
(H2-h2)
NO version
Signal
Status
IN1
Suction ON
OUT
Vacuum > H2
IN1
Suction OFF
IN2
Blow off ON
OUT
Vacuum <
(H2-h2)
EN-US · 30.30.01.02636 · 00 · 01/21

Advertisement

Table of Contents
loading

Table of Contents