3.5. Verifying Installation

The TransPortal provides visual confirmation of connectivity and operation using a top
panel backlit LCD display and bi-color LED status indicators. See Figure 2-1.

3.5.1. Initialization

As the TransPortal powers up, the LCD top panel display typically shows the following;
As part of the power up sequence, the TIM checks operation of the four bi-color LED
status indicators on the top panel of the unit. Each LED state is tested (OFF, Red, and
Green).

3.5.2. Operation

Following initialization, the LCD display shows the IP addresses of the Ethernet
connection between the TIM (typically ETH1) and the host server. A typical display is
shown below.
During operation, only the Communication Status and System Status LED indicators are
used in this application. Table 3-1 describes the TIM status for each state of the active
LED indicators in this application.
Communication Status LED
System Status LED
Copyright 2019
TransPortal Remote
Monitoring Network
Ansalso-STS USA
Initializing...
Eth1 IP Address
192.168.1.110
SNMP Host Address
192.168.1.111
Table 3-1.
Active Top Panel LED Indicators
ACTIVE LED
Green
Red
Off
Green
Red
SM-1H1.0002 Rev. 2, March 2019
TransPortalTM Interlock Monitor
DESCRIPTION
Connected to and communicating with
the M
controller
ICROLOCK II
M
controller communication
ICROLOK II
link pre-empted or lost
Communication software not running
System software running
System software not running