Complete The Leg Assembly - SunSetter OASIS Owner's Manual & Assembly Instructions

Freestanding awning
Table of Contents

Advertisement

16. Orient one of the Leg Assemblies as shown in Figure 6.
17. Push the Leg Assembly onto the Square Bar Upright, making sure that the Bolt Holes in the Leg Assembly
and Square Bar Upright are properly aligned. See Figure 6a.
Figure 6a
18. Using two sets of Hardware (1 Nut, 1 Bolt and 2 Washers) secure the Leg Assembly to the Square Bar
Upright and securely tighten Bolts.
19. Repeat Steps 16 thru 18 for the other end of the Awning Assembly. Have a helper hold the Awning steady
while attaching the second Leg Assembly.
WARNING: BEFORE REMOVING THE PLASTIC SLEEVES, MAKE SURE NO PERSON IS IN CLOSE PROXIMITY TO
THE AWNING FRONT BAR ASSEMBLIES. FAILURE TO DO SO COULD RESULT IN PERSONAL INJURY.
20. Remove the Plastic Safety Sleeves from all four (4) Arm Assemblies, one at a time.
Note: You may need to squeeze Lateral Arms together to easily remove the Plastic Safety Sleeves. Do not use
a knife or blade to cut the Safety Sleeves. When removed, do not discard the Safety Sleeves, retain them for
future use. Remove the Red Foam Packing from the middle of the Awning Assembly. See Figure 7.
Figure 7
4" Plastic
Safety Sleeve

Complete the Leg Assembly

Bolt Holes
Elbow
Pivot
Point
Red Foam
Packing
4
4" Plastic
Safety Sleeve

Advertisement

Table of Contents
loading

Table of Contents