Installation And Commissioning Checklist; Gaitway-3D Unpacking - h/p/cosmos Arsalis Gaitway 3D Service Manual

Table of Contents

Advertisement

gaitway-3D Service manual
Ref.:TM-MAN-0005-ARS

12. Installation and commissioning checklist

Date:
Time:
Seq.
Description
No.
1.
Test Readiness Review:
 Check
implementation
precautions
 Identify item name, identification number
and serial number.

12.1. gaitway-3D unpacking

Date:
Time:
Seq.
Description
No.
2.
Remove the top of the palette.
3.
Remove each sub-unit from the palette. The
right handrail shall remain fixed due to cable
connections.
4.
Move all sub-units and the treadmill to
installation site. The treadmill can be moved
on two wheel boards.
Iss.: A
Rev.: 9
Date: 07/12/2020
Test Step
Required/No
minal (incl.
tolerance)
of
safety
Test Step
Required/No
minal (incl.
tolerance)
Page : 19
Name:
Measurements/Test Results
Measured/
Remarks/Calculations
Calculated
Device name, type:
Device s/n:
Instrumentation s/n:
Name:
Measurements/Test Results
Measured/
Remarks/Calculations
Calculated
Pass/
No
pass
Pass/
No
pass