Operation; Water Connection & Operation - Borg & Overstrom B4 Install & Operation Manual

Hide thumbs Also See for B4:
Table of Contents

Advertisement

Borg & Overström

Operation

Water Connection & Operation
NOTE: Water supply to the product must be within 1.5 - 3.5 bar.
A pressure limiting valve and dual check valve in accordance with
AS/NZS 3500.1 & AS/NZS 3500.2 must be used for all incoming
water supplies. This is included in Part No. 461263 - AU Installation Kit.
If the product is installed where the mains water pressure is less than 1.5 bar
then a pressure boost pump must be installed prior to the water inlet bulkhead.
Failure to comply with this will invalidate your warranty.
1
Connect and turn on the water
supply. Then connect the power
supply.
4
4
All hot & sparkling tanks must
be purged of air by holding the
corresponding button. Do not
switch the hot system on until
tank has been purged.
B4.2 Install & Operation Manual
2
C O L D
H O T
To avoid damage do not turn on
the cold or hot power switches
until water flows out of the
machine. (If applicable)
5
C O L D
On sparkling models turn on the
carbonation switch on the back
of the unit.
7
3
Press and hold the cold water
button until water comes out.
6
The relevant indicator lights will
be lit.
AU

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the B4 and is the answer not in the manual?

This manual is also suitable for:

B4

Table of Contents