Operation - Borg & Overstrom B5 Series Install & Operation Manual

Hide thumbs Also See for B5 Series:
Table of Contents

Advertisement

Borg & Overström

Operation

Water Connection & Operation
1
Connect and turn on the water
supply.
4
Activate cold power switch.
7
10 c
4c
hot
cold
heating
chilling
The temperature of cold water
can be set from 4c to 10c.
When the chilling LED is off
the set temperature has been
reached. This can take up to
one hour.
Install & Operation Manual
2
Plug in the power supply,
cold, hot & sparkling tanks will
automatically fill.
5
10
L
Flush through 10 litres of water
before use.
8
hot
cold
heating
chilling
When the heating LED is off the
pre-set temperature has been
reached. This can take up to
30mins.
8
3
Activate the carbonation & hot
power switch (if present).
6
hot
cold
heating
chilling
When the cold water switch is
turned on, the cold water and
chilling LED will be on.
GB

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the B5 Series and is the answer not in the manual?

Table of Contents