Checklist questions
Yes
No
Is the computer room
structurally complete
(walls, floor, air
conditioning system, and
so on)?
If there is a raised floor, is
the floor adequate for the
equipment load?
Is antistatic flooring or
mats installed?
Are there cutouts or
channels to route cables?
Does the room have access
to the storage and IP
networks?
Can the temperature be
maintained between 50° to
104°F (10° to 40°C)?
Can the humidity level be
maintained between 8%
and 80%?
Is the computer room
protected against dust,
pollution, and metallic
particulate contamination?
Does the computer room
take into account
environmental
considerations, such as
vibration and acoustics?
Is all equipment not
supplied by Hitachi (for
example, connectors,
receptacles, and network
switches) on site and ready
for use?
Computer room electrical requirements
Appendix A: Site preparation checklist
Site Preparation Guide for VSP G/F350, G/F370, G/F700, G/F900
51