1.4 substantival explanation
When operate the NCH02, where will be a lot of English abbreviation, now we list all of
them for your kindly references:
FRO: Feeding adjust: During the operating process, the F value already set, and need to
adjust the current feeding speed, then we can adjust FRO value to realize it.
SRO: Spindle speed adjust: During the operating process, the S value already set, and need
to adjust the current spindle speed, then we can adjust SRO value to realize it :
Current Speed S#=setting S*SRO.
SRJ: speed adjust manually
During the operating process,as the manual speed already set,and we need to adjust the
current speed,and impossible to fix the value during it is working,then we can revise the SRJ
value to realize it.
Current manual speed FS#=Setting manual speed*SRJ.
F:Feedingspeed,the unit is mm/min.For example F=200,means every minute feeding
2000mm.
S: Spindle Speed. Unit is rad/min.For example S=20000,means 20000 revolution/Minute.
X axis Coordinate
Y axis Coordinate
Z axis Coordinate
A axis Coordinate
B axis Coordinate
C axis Coordinate
Ready:ReadyMode.In the mode we can do any operation,include processing or values
Manual of NCH02
- 4 -
www.nvcnc.net
Need help?
Do you have a question about the NCH02 and is the answer not in the manual?
Questions and answers