Connect the communication cables between battery stacks: one by one from Stack last to
the Stack 1 (from LinkPort0 to Linkport1).
Connect the communication cable between master battery stack (Stack 1) to the inverter.
The length of communication cable between stacks must ≤2m.
It is recommended to use cable provided by Pylon, if not the compatible water proofed
connecter (M19-RJ45) is necessary.
Or
20 / 31