5) Protective tube connection
Every location must have to measure a length in between ATU  SPU  DPU for adjusting the
length of protective tube.
ATU
4.3.

Signal Processing Unit

In a case of using
M10 bolt and nut
to fix on stand.
M10 bolt
Top view of SPU
4) Cover upper radome and fix 12 pcs of M10x35
bolt which remains on the bottom radome with
fall prevention structure.
12xM10 Stopper Bolt
Open/Close radome
SPU
. Spare
1) Fix SPU on the ground or fixed channel base
using M10 bolt and nut x4pcs.
2) SPU condition at delivery.
M10 bolt
35
DPU
(Indoor)
USB cable
Coaxial cable
PXI CONT
PXI
LAN cable
Power cable