Opening The Radome Temporary - Furuno WR2120 Installation Manual

Weather radar
Hide thumbs Also See for WR2120:
Table of Contents

Advertisement

4.2.5. Opening the radome temporary

This requires another people on the opposite side.
threaded bolts to secure the upper radome for maintenance work if it is not possible to remove
the upper radome. This bolt set is in the maintenance tool box. Put these bolts from bottom holes
to the fixed nuts on the upper radome. To hold up the upper radome in balance, bolts should be
distributed evenly.
Caution: DO NOT open the upper radome during strong wind or radome may become airborne,
causing harm to individual(s) or radar.
(1) Loosen all 12pcs M10 bolts which will retain
on the bottom radome for fall prevention.
(2) Rotate upper radome 10 degrees counter
clockwise until M10 bolts fit to the recess
holes in order to align thru-hole on radome
base with nut insert on upper radome.
(3) Insert threaded bolts, with nut setup 10mm
from the end, into each thru-hole from
bottom radome to upper radome nut insert.
(4) Lift up the upper radome until M10 nut
contacts radome base and hold it.
(5) Attach a spring clamp on each threaded bolt
to secure all bolts.
Figure 4.13: Bottom view of radome
(2)
Figure 4.12: Side view of radome with
e.g,. 6 threaded bolts.
(1) M10 bolt
(4) Thru hole
Recess
Nut insert
Upper
radome
(2)
Bottom
radome
(3) Threaded
(1) M10 bolt
When open radome temporary, use long
※Tighten up nuts by finger.
(Do not use any tools)
Upper radome
Threaded bolt
Spring clamp
M10 nut
Bottom radome
Ensure the radome remains level when
adjusting threaded bolt lengths.
Caution:
The radome may be damaged if it
does not remain level.
Recess
(It uses a dropout prevention bolt)
Figure 4.14: Side view of after rotating
bolt
the upper radome to the right
28
Nut insert
(4)
(5)
Approx.
330mm
(3)
10mm
Nut insert
Top radome
Bottom radome
Thru hole
Detent bolt

Advertisement

Table of Contents
loading

Table of Contents